Skip to Content

Aiko

Technical brand selection

How to choose between the AIKO modules in the professional catalogue

The visible AIKO references differ in power, dimensions and cable presentation according to their public names. A rigorous decision requires comparing the full model, electrical parameters, temperature, strings, MPPT limits, format, weight, clamping zones, loads, connectors, mounting, logistics and current documentation.

Visible references and familiesAIKO-A615-MAH72MwAIKO-A665-MDE72Dw
Over 20 years of experienceProfessional catalogue and supportValidation against the exact reference
Aiko 615Wp AIKO-A615-MAH72Mw Long Cable (2278x1134x30 mm)
Aiko 615Wp AIKO-A615-MAH72Mw Long Cable (2278x1134x30 mm)
Manufacturer model: AIKO-A615-MAH72Mw
Technical series: Comet 1N / MAH72Mw
Module dimensions: 2278 x 1134 x 30 mm
Net module weight: 27 kg
Pallet: 36 pcs
Pallet dimensions: 2325 x 1135 x 1265 mm
Gross pallet weight: 1022 kg
Container: 20 pallets / 720 pcs
Cable configuration: Long Cable
Out of Stock
Aiko 665Wp AIKO-A665-MDE72Dw Short Cable (2382x1134x30 mm)
Aiko 665Wp AIKO-A665-MDE72Dw Short Cable (2382x1134x30 mm)
Manufacturer model: AIKO-A665-MDE72Dw
Technical series: Stellar 3N+ / MDE72Dw
Module dimensions: 2382 x 1134 x 30 mm
Net module weight: 32.2 kg
Pallet: 36 pcs
Pallet dimensions: 2395 x 1135 x 1265 mm
Gross pallet weight: 1276 kg
Container: 20 pallets / 720 pcs
Cable configuration: Short Cable
Out of Stock
Decision guide

Comparison of visible AIKO references

Public referenceCatalogue identificationValidate before quoting
Public referenceAIKO-A615-MAH72MwCatalogue identification615 Wp · Long Cable · 2278 × 1134 × 30 mm according to the current public name.Validate before quotingExact data sheet, electrical parameters, cable/connector length and type, weight, loads and clamping zones.
Public referenceAIKO-A665-MDE72DwCatalogue identification665 Wp · Short Cable · 2382 × 1134 × 30 mm according to the current public name.Validate before quotingFormat and handling, exact data sheet, Vmpp, Voc, Impp, Isc, strings, MPPT, mounting, loads and logistics.

What differentiates the two visible AIKO references?

Their public names show different power, format and cable presentation. Final selection requires comparing the full data sheets and exact reference.

Should AIKO be selected by module power alone?

No. Compare whole-array energy and power, usable area, format, weight, electrical data, mounting, handling, warranty, logistics and total cost.

Can an existing panel be replaced directly with an AIKO panel?

It must not be assumed. Check dimensions, clamping, Vmpp, Voc, Impp, Isc, strings, connectors, mounting and overall array behaviour.

How is the number of AIKO modules per string determined?

Using the exact model data sheet, site minimum and maximum temperatures, maximum voltage, start voltage, MPPT window and inverter current limits.

What must be checked for the mounting system?

Format and weight, clamping zones and range, orientation, wind and snow loads, roof type, fixings, expansion, access and handling.

What data does PnP need to guide AIKO selection?

Application, roof dimensions, location, target power, inverter, strings, mounting, weight or format limits, cabling requirements, logistics and lead time.

Validate the AIKO reference before finalising the quote

We help compare the PV array, strings, inverter, mounting, cabling and logistics.

Updated 12 September 2026. The references cited come from the current public catalogue; final selection is validated against the exact model data sheet.

WhatsApp