High-density modularity
Each block supports up to 21 BAT 12 modules and provides 253.26 kWh nominal.
A commercial and technical guide for installers and engineering companies that need to define power, capacity and architecture before requesting a SigenStack quotation.
Request SigenStack sizingHigh-density C&I reference made up of six 253.26 kWh blocks with 125 kW hybrid PCS. The configuration reaches 1,520 kWh and 750 kW nominal.
Each block supports up to 21 BAT 12 modules and provides 253.26 kWh nominal.
IP66 protection, aerosol suppression, smoke sensor and thermal control integrated according to the product family.
Six blocks with 125 kW PCS allow capacity and power to grow by subsystem.
Gateway, metering, EMS and protocols are selected according to grid, backup and plant strategy.
Indicative breakdown of the system shown. Final references, protection and accessories are validated against the single-line diagram and real project data.
| Quantity | Equipment or material | Function and criterion | Scope |
|---|---|---|---|
| 126 | Sigenergy SigenStack BAT 12 modules · 12.06 kWh | 21 modules per block; 126 × 12.06 kWh = 1,519.56 kWh, rounded to 1,520 kWh. | Included |
| 6 | SigenStack battery controllers compatible with 0.5C | One per block for battery management, protection and communications. | Included |
| 6 | SigenStack base assemblies and cable kits | One configuration per block; the variant depends on linear or back-to-back layout. | Engineering dependent |
| 6 | SigenStack covers | One per block to protect the modular assembly. | Included |
| 6 | 125 kW Sigenergy C&I hybrid PCS | One per block; model, version and current documentation are validated before quotation. | Included |
| Engineering dependent | Gateway, metering, switchgear, protection and EMS | Sized against the single-line diagram, grid, critical loads and control strategy. | Engineering dependent |
| Optional | Renlogger-C / supervision integration | Option subject to protocol validation for zero export, time shifting and peak shaving. | Optional |
We need to validate the following data to turn this reference into an executable quotation.
Reference source: Plug and Play Energy C&I BESS Portfolio and technical components verified in Odoo. · 2026-09-19
Evaluate the system when the goal is to increase self-consumption, shift energy, limit peaks, back up critical loads or integrate a microgrid. The solution is not selected by kWh alone: power, load profile, phases, grid, generator and control strategy also matter.
The professional catalogue includes SigenStack BAT 12 modules, battery controllers, bases, covers, Sigen PV hybrid inverters and Gateways for C&I architectures. Exact configuration, compatibility and component quantities are verified for each project.
A useful quotation requires real project data. A monthly bill alone is not always enough to define the best power or capacity.
Catalogue availability does not replace project compatibility and sizing validation.
kW indicates the instantaneous power the system can deliver or absorb; kWh indicates stored energy. Both values must be sized against the load profile and operating goal.
It depends on the architecture, inverters, metering point and goal. Review the single-line diagram and existing-system compatibility before defining an AC- or DC-coupled solution.
It can form part of compatible backup architectures, but critical loads, starting power, autonomy, switching, protection and Gateway must be defined. The entire installation does not necessarily need backup.
An indicative proposal covering architecture, power, capacity, main equipment and data still to be validated. The final quotation depends on the project’s technical and commercial information.
We work with installers and engineering companies. Send the available information and we will identify what is still needed for sizing.
Request SigenStack sizingAuthor: Arturo Andrés · Technical review: Plug & Play Energy storage team · Updated: 16/08/2026
Main source: Official Sigenergy documentation and support. The final architecture must be validated using current documentation, the single-line diagram and real project data.
See a real 504 kWh and 300 kW supply for a C&I project.