Real SigenStack case: 504 kWh and 300 kW C&I supply

Commercial and industrial configuration delivered as a complete set and verified in Plug & Play Energy delivery records.

Real SigenStack case: 504 kWh and 300 kW C&I supply
504 kWh
42 SigenStack BAT 12 modules
300 kW
3 Sigen PV 100M1-HYB inverters
3 controllers
SigenStack BC M2-0.5C-BST
1 Gateway
Sigen Gateway C600-B

Data published or evidenced by delivery records. No economic or operational results are invented.

The scope

Supply for a C&I project in Spain, with the end customer kept anonymous. This page shows a real delivered configuration without publishing private commercial information.

The verified configuration

42 SigenStack BAT 12 modules, three 100 kW hybrid inverters, three battery controllers, three MAIN bases, three SUB bases, three covers, one C600-B Gateway and eight installation kits.

The evidenced result

The equipment was delivered on 4 June 2026. The supplied nominal capacity was 504 kWh and the included hybrid power was 300 kW. No savings, operating performance or commissioning claims are made because those data are not verified.

Do you have a similar project?

Send us the load curve, production, goal and single-line diagram to prepare a comparable proposal.

Request a studyView the SigenStack C&I guide

Author: Arturo Andrés · Technical review: Plug & Play Energy storage team · Updated: 17/08/2026

Source: Plug & Play Energy SigenStack guide.

WhatsApp