INDUSTRIAL STORAGE FOR INSTALLERS AND ENGINEERING COMPANIES

Industrial BESS: project sizing and quotation

First define the technical and economic objective of storage. Then select power, capacity, architecture, protection and control strategy.

Request an industrial BESS study

What the BESS must solve

An industrial project may pursue several outcomes. Prioritising them avoids oversizing and allows scenarios to be compared on the same basis.

  • Increase self-consumption and reduce surplus energy
  • Reduce demand peaks and billed power
  • Shift consumption to lower-cost hours
  • Back up critical loads
  • Integrate PV, grid, generator and energy management

How power and capacity are sized

Power relates to the kW that must be covered; capacity relates to the kWh that must be shifted or backed up. Real curves and operating constraints are simulated, not monthly consumption alone.

  • Load and production curves with sufficient resolution
  • Charge and discharge window
  • Minimum SOC, efficiency and degradation
  • Power per phase, peaks and starting currents
  • Grid, export and operating limits

What a professional proposal includes

The scope is adapted to project maturity and clearly separates assumptions, equipment and pending engineering work.

  • Power and capacity scenario
  • Preliminary architecture and main equipment
  • BOS, protection, metering, EMS and communications
  • Economic assumptions and calculation limits
  • Installation, commissioning and maintenance requirements

Frequently asked questions

What information is required for a BESS quotation?

Load and production curves, bills, contracted power, single-line diagram, goal, location, space, critical loads and expansion plans. The better the time-series data, the more useful the proposal.

Can a BESS be sized from an electricity bill alone?

It allows an initial estimate but does not describe peaks or time distribution. For peak shaving, backup or arbitrage, 15-minute or higher-resolution curves are recommended.

How is backup autonomy calculated?

Start from the power and energy of critical loads, their peaks, simultaneity, required hours, available SOC, efficiency and reserve. Autonomy does not depend on nominal capacity alone.

Does the quotation include engineering and installation work?

It depends on the requested scope. The proposal should state whether it includes equipment, BOS, protection, engineering, installation, commissioning and maintenance to avoid incomplete comparisons.

Turn project data into a comparable proposal

We work with installers and engineering companies. Send the available information and we will identify what is still needed for sizing.

Request an industrial BESS study

Author: Arturo Andrés · Technical review: Plug & Play Energy storage team · Updated: 16/08/2026

Main source: Plug & Play Energy storage area. The final architecture must be validated using current documentation, the single-line diagram and real project data.

Sigenergy vs Atmoce

Compare architecture, retrofit, backup and scalability.

View comparison

AC vs DC batteries

Choose the architecture for a new installation or retrofit.

View guide