Sigenergy retrofit at Serigrafía Sergar: 36 kWp and 45 kWh
Sigenergy · CASO REAL DOCUMENTADO

Sigenergy retrofit at Serigrafía Sergar: 36 kWp and 45 kWh

A Myenergy Spain industrial project adding storage and partial backup to an existing installation with a Huawei inverter.

Source: Plug & Play Energy · 06/08/2026

36 kWpPV capacity
30 kWInversor SigenStor
45 kWhTotal storage
5 × 9 kWhBattery modules
Huawei 36KTLExisting inverter

Architecture and project goal

The project preserves the existing PV investment and adds a SigenStor system to store surplus energy and back up critical loads. The retrofit avoids replacing the Huawei inverter and enables phased modernisation.

Published technical points

  • Partial backup for critical loads.
  • Management of solar surplus energy.
  • Integration with the existing Huawei 36KTL inverter.
  • Scalable architecture for an industrial environment.

Original post

We preserve author attribution and original context through the official embedded post.

Do you have a similar project?

Send us the load curve, power, goal, diagram and existing equipment to prepare a comparable technical proposal.